Mer installs trailer-coupled charging for Wren's ten eActros600s
Mer Fleet Services installs depot charging at Wren Kitchens' Barton-upon-Humber depot for 10 new electric HGVs.

Mer has built Wren Kitchens' new depot charging setup at Barton-upon-Humber to solve a specific eHGV headache: charging artics without unhooking the trailer. The installation pairs a triple Kempower power unit with six satellite chargers, dynamically splitting output across vehicles, with the chargers positioned to match the eActros600's port so trucks can plug in trailer-and-all SMMT. It took nearly two kilometres of cabling to get there. Ten eActros600s are now arriving on the back of it.
Sources
SMMTHow THRIVE sources and checks its stories · Corrections, and how to report an error

UK zero-emission HGV registrations fell 6.6% in the first half as EU electric truck registrations grew almost 48%, Kempower argues

Welch's Transport opens megawatt eHGV charging hub at Cambridge site, built by Voltempo

Russell Group demonstrates megawatt charging on MAN eTGX in Coatbridge
The Tuesday briefing
The week's fleet numbers and news, every Tuesday morning. Free.
One email a week. Unsubscribe in a click.
Named in this story? You have a right of reply: email hello@thrivefleet.co.uk and a challenged claim will be marked under review while we check it.
Got a story, or a question about this one? Contact the newsroom. We read everything that comes in. With the volume of fleet news, not everything can run, but a story with a number, a date or a decision in it stands a good chance.